The connected signal package for DC Metro must remain outside the destination system until the blocking controls are cleared.
Feed availability
3 of 3 connected signals are still resolving. Required: Wait for every required source to complete before release.
Source integrity
1 source trail needs explicit owner approval. Required: Confirm the source authority before releasing this package.
Freshness and time scope
Every signal declares the period in which it is intended to be used.
Geographic scope
Every signal carries an explicit location scope.
Machine contract
3 connected signals fail the required release contract. Required: Restore the missing fields or safe product route before release.
Source independence
3 signal domains are backed by 2 source families.
Conflict screening
No duplicate signal identities or contradictory release states were found.
- Wait for every required source to complete before release.
- Confirm the source authority before releasing this package.
- Restore the missing fields or safe product route before release.